GN mud system is composed of 4 phase mud treatment equipment & mud tanks, including auxiliary equipment, like mud agitator, mud gun, mud hopper etc.  Recently, we have one client from Middle East who need to buy 2 sets of mud system for the water well drilling rigs.  As the water well will be drilled to 1000m to 1500m depth, we recommend complete mud system with 4 phase mud separation equipment.

gn mud cleaning system

The required two sets mud system are the same, each mud system equipped with below items:

1) Shale shaker

4 panel shale shaker with composite material shaker screen. The shaker screen is equivalent to Swaco Mongoose.

4 panel shale shaker with longer shaker deck, the separation performance of the drilling mud will be much better than 2 panel or 3 panel shale shaker.

Some client may have large quantity shaker screen stock for King cobra shaker, we can customize proper size shale shaker to meet the requirement.

2) Mud cleaner

4 panel mud cleaner, with 4 panel shale shaker & 1ea desander cyclones & 8ea desilter cyclones.

The mud cleaner with below advantages:

  • Desander & Desilter & Shale Shaker 3 in one unit mud cleaner for compact footprint.
  • Polyurethane Material hydrocyclone for long life
  • Removable hydrocyclone assembly for adjust to be a shale shaker.
  • Patent  shaker deck angle adjustable while working, mechanical deck angle adjustment with reliable performance.
  • Patent tighten rubber sealing for mud cleaner shaker deck and screen for fine screen

3) 40ft container size mud tank

The mud tank is same size to 40ft container with container locking port and lifting pad eyes.  The mud tank also equipped with 1ea mud agitator in the 3rd compartment of the clean mud, and one mud hopper with one centrifugal pump is installed on the skid of the mud tank to mixing chemicals.

If you need more information of GN mud system for water well drilling, pls contact us freely.


ABOUT THE AUTHOR

GN ShakerScreen